- Density Test Report Report ID: 89776
- Edit Download Report
Density Test Report
Date :01/30/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :01/30/2026 08:30
Onsite Hours :07:00
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :01/30/2026 15:30
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/30/2026 | 1 | 21.9 | 88.8 | 2025-057 | 92.1 | 25.7 | 96.4 | 95 | D2937 | Pass |
| Location : | Between Point B9-B10, Elv/Depth :3 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 01/30/2026 | 2 | 22.9 | 87.7 | 2025-057 | 92.1 | 25.7 | 95.2 | 95 | D2937 | Pass |
| Location : | Between Points B10-B11, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateSamara Simha Reddy Kandi, January 30, 2026
Reviewer Name / DateKenneth Mosman, February 18, 2026