Density Test Report

Date :01/30/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :01/30/2026 08:30
Onsite Hours :08:30
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :cloudy
Departure Time :01/30/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/30/2026 1 17.5 97.2 2025-031SP 101.0 20.7 96.2 95 D6938 Pass
Location : Building Lot #37, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
01/30/2026 2 16.9 98.3 2025-031SP 101.0 20.7 97.3 95 D6938 Pass
Location : Building Lot #36, Elv/Depth :4 feet below finished basement level
Comment : Gauge Serial No. :91643
01/30/2026 3 16.5 99.5 2025-031SP 101.0 20.7 98.5 95 D6938 Pass
Location : Building Lot #35, Elv/Depth :2.5 feet below finished basement level
Comment : Gauge Serial No. :91643
01/30/2026 4 17.2 101.0 2025-033 SP 104.0 16.2 97.1 95 D6938 Pass
Location : Building Lot #37, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91643
01/30/2026 5 15.7 102.7 2025-033 SP 104.0 16.2 98.8 D6938 Pass
Location : Building Lot #36, Elv/Depth :2 feet below finished basement level
Comment : Gauge Serial No. :91643
01/30/2026 6 12.8 106.9 2025-035 SP 107.8 13.0 99.2 95 D6938 Pass
Location : Building Lot #35, Elv/Depth :1 foot below finished basement level
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, January 30, 2026
Reviewer Name / DateKenneth Mosman, February 02, 2026