- Home
- Density Test Report Report ID: 89879
- Edit Download Report
Density Test Report
Date :02/03/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :02/03/2026 10:00
Onsite Hours :05:15
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :02/03/2026 15:15
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 02/03/2026 | 1 | 21.0 | 93.2 | 2025-059 | 88.7 | 22.0 | 105.1 | 95 | D2937 | Pass |
| Location : | Between Manhole B9-B10, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | ||||||||||
| 02/03/2026 | 2 | 24.1 | 85.7 | 2025-059 | 88.7 | 22.0 | 96.6 | 95 | D2937 | Pass |
| Location : | Between manhole B10-B11, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | ||||||||||
Technician Signature / DateSamara Simha Reddy Kandi, February 3, 2026
Reviewer Name / DateKenneth Mosman, February 18, 2026