- Home
- Density Test Report Report ID: 90014
- Edit Download Report
Density Test Report
Date :02/05/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :02/05/2026 08:30
Onsite Hours :9:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :Sunny
Departure Time :02/05/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 02/05/2026 | 1 | 19.8 | 92.6 | 2025-032 SP | 94.9 | 25.0 | 97.6 | 95 | D6938 | Pass |
| Location : | Backfill for 8" ductile iron sewer line between manholes# 13 and 15, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/05/2026 | 2 | 23.2 | 91.1 | 2025-032 SP | 94.9 | 25.0 | 96.0 | 95 | D6938 | Pass |
| Location : | Backfill of 8" ductile iron sewer line between manholes #13 and 15n manholes #, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/05/2026 | 3 | 22.4 | 92.6 | 2025-032 SP | 94.9 | 25.0 | 97.6 | 95 | D6938 | Pass |
| Location : | Backfill of 8" ductile iron sewer line between manholes #14 and 15, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/05/2026 | 4 | 23.0 | 92.8 | 2025-032 SP | 94.9 | 25.0 | 97.8 | 95 | D6938 | Pass |
| Location : | Backfill of 8" ductile iron sewer line between manholes #14 and 15, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/05/2026 | 5 | 12.6 | 105.6 | 2025-035 SP | 107.8 | 13.0 | 98.0 | 95 | D6938 | Pass |
| Location : | Backfill of 8" ductile iron sewer line between manholes # 13 and 14, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/05/2026 | 6 | 12.6 | 105.9 | 2025-035 SP | 107.8 | 13.0 | 98.2 | 95 | D6938 | Pass |
| Location : | Backfill of 8"ductile iron sewer line between manholes # 13 and 14, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, February 5, 2026
Reviewer Name / DateKenneth Mosman, February 16, 2026
