- Home
- Density Test Report Report ID: 90151
- Edit Download Report
Density Test Report
Date :02/09/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :02/09/2026 09:30
Onsite Hours :07:00
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :sunny
Departure Time :02/09/2026 16:30
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 02/09/2026 | 1 | 23.7 | 98.2 | 2026-010 | 98.1 | 22.4 | 100.1 | 95 | D6938 | Pass |
| Location : | Between V0-V1, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :3430 | |||||||||
| 02/09/2026 | 2 | 24.1 | 97.1 | 2026-010 | 98.1 | 22.4 | 99.0 | 95 | D6938 | Pass |
| Location : | Between V0-V1, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :3430 | |||||||||
Technician Signature / DateSamara Simha Reddy Kandi, February 9, 2026
Reviewer Name / DateKenneth Mosman, February 18, 2026
