- Home
- Density Test Report Report ID: 90168
- Edit Download Report
Density Test Report
Date :02/09/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :02/09/2026 08:00
Onsite Hours :9:30
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :02/09/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 02/09/2026 | 1 | 15.8 | 96.5 | Field proctor #6 | 98.0 | 17.2 | 98.5 | 95 | D6938 | Pass |
| Location : | Building Lots #65 and 66, Elv/Depth :20 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/09/2026 | 2 | 14.7 | 96.7 | Field proctor #6 | 98.0 | 17.2 | 98.7 | 95 | D6938 | Pass |
| Location : | Building Lots #65 and 66, Elv/Depth :20 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/09/2026 | 3 | 14.9 | 95.9 | Field proctor #6 | 98.0 | 17.2 | 97.9 | 95 | D6938 | Pass |
| Location : | Building Lots #65 and 66, Elv/Depth :18 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, February 9, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026
