Density Test Report

Date :02/10/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :02/10/2026 14:30
Onsite Hours :03:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :02/10/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/10/2026 1 26.3 91.1 2025-032 SP 94.9 25.0 96.0 95 D6938 Pass
Location : Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+2 feet side of pipe
Comment : Gauge Serial No. :91643
02/10/2026 2 24.2 91.7 2025-032 SP 94.9 25.0 96.6 95 D6938 Pass
Location : Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+2 feet side of pipe
Comment : Gauge Serial No. :91643
02/10/2026 3 23.7 92.5 2025-032 SP 94.9 25.0 97.5 95 D6938 Pass
Location : Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+4 feet side of pipe
Comment : Gauge Serial No. :91643
02/10/2026 4 26.3 93.7 2025-032 SP 94.9 25.0 98.7 95 D6938 Pass
Location : Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+4 feet side of pipe
Comment : Gauge Serial No. :91643
02/10/2026 5 25.2 94.0 2025-032 SP 94.9 25.0 99.1 95 D6938 Pass
Location : Backfill for 48" RCP storm line between OCS and headwall #3, Elv/Depth :+4 feet side of pipe
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 10, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026