Skip to content

Density Test Report

Date :02/13/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :02/13/2026 08:00
Onsite Hours :07:30
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :cloudy
Departure Time :02/13/2026 15:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/13/2026 1 16.6 97.3 Field proctor #6 98.0 17.2 99.3 95 D6938 Pass
Location : Building Lots #63 thru 66, Elv/Depth :11 to 20 feet below finished grade
Comment : Gauge Serial No. :91643
02/13/2026 2 16.3 96.5 Field proctor #6 98.0 17.2 98.5 95 D6938 Pass
Location : Building Lots #63 thru 66, Elv/Depth :11 to 20 feet below finished grade
Comment : Gauge Serial No. :91643
02/13/2026 3 15.9 96.0 Field proctor #6 98.0 17.2 98.0 95 D6938 Pass
Location : Building Lots #63 thru 66, Elv/Depth :11 to 20 feet below finished grade
Comment : Gauge Serial No. :91643
02/13/2026 4 15.4 96.0 Field proctor #6 98.0 17.2 98.0 95 D6938 Pass
Location : Building Lots #63 thru 66, Elv/Depth :11 to 20 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 13, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026