Density Test Report

Date :02/17/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :02/17/2026 09:00
Onsite Hours :9:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :02/17/2026 18:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/17/2026 1 13.3 103.4 2025-035 SP 107.8 13.0 95.9 95 D6938 Pass
Location : 18" RCP storm line between D13 and D20, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
02/17/2026 2 12.8 104.8 2025-035 SP 107.8 13.0 97.2 95 D6938 Pass
Location : 18" RCP storm line between D13 and D20, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
02/17/2026 3 12.1 118.7 2025-035 SP 107.8 13.0 98.2 95 D6938 Pass
Location : 18" RCP storm line between D13 and D20, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
02/17/2026 4 14.2 120.9 2025-035 SP 107.8 13.0 98.2 95 D6938 Pass
Location : 18" RCP storm line between D13 and D20, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 17, 2026
Reviewer Name / DateKenneth Mosman, February 23, 2026