Skip to content

Density Test Report

Date :02/18/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :02/18/2026 08:00
Onsite Hours :9:30
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :02/18/2026 17:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/18/2026 1 13 111.4 2025-022 SP 103.7 16.1 107.4 95 D6938 Pass
Location : Lot #41, Elv/Depth :1030.65
Comment : Gauge Serial No. :91487
02/18/2026 2 23.1 102.6 2025-023 SP 103.5 18.9 99.1 95 D6938 Pass
Location : Lot #39, Elv/Depth :1015.97
Comment : Gauge Serial No. :91487
02/18/2026 3 18.1 101.5 2025-023 SP 103.5 18.9 98.1 95 D6938 Pass
Location : Lot #40, Elv/Depth :1025.33
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, February 18, 2026
Reviewer Name / DateKenneth Mosman, February 24, 2026