Density Test Report

Date :02/19/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :02/19/2026 09:00
Onsite Hours :9:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :02/19/2026 18:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/19/2026 1 12.3 105.4 2025-035 SP 107.8 13.0 97.8 95 D6938 Pass
Location : 8" SS line between manhole #9 and 9.1, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
02/19/2026 2 11.3 105.9 2025-035 SP 107.8 13.0 98.2 95 D6938 Pass
Location : 8" SS line between manhole #9 and 9.1, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
02/19/2026 3 11.9 118.4 2025-035 SP 107.8 13.0 98.1 98 D6938 Pass
Location : 8" SS line between manhole #9 and 9.1, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
02/19/2026 4 14.8 96.9 Field proctor #6 98.0 17.2 98.9 95 D6938 Pass
Location : Building lots #63 and 64, Elv/Depth :6 to 8 feet below finished grade
Comment : Gauge Serial No. :91643
02/19/2026 5 14.3 96.6 Field proctor #6 98.0 17.2 98.6 95 D6938 Pass
Location : Building lots #63 and 64, Elv/Depth :6 to 9 feet below finished grade
Comment : Gauge Serial No. :91943
02/19/2026 6 11.2 106.5 2025-035 SP 107.8 13.0 98.8 95 D6938 Pass
Location : Building lot #64, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 19, 2026
Reviewer Name / DateKenneth Mosman, February 26, 2026