Density Test Report

Date :02/23/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :02/23/2026 11:30
Onsite Hours :03:00
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny cold
Departure Time :02/23/2026 14:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/23/2026 1 15.4 95.7 Field proctor #6 98.0 17.2 97.7 95 D6938 Pass
Location : Building Lot #40, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
02/23/2026 2 14.3 95.7 Field proctor #6 98.0 17.2 97.7 95 D6938 Pass
Location : Building Lot #40, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
02/23/2026 3 14.4 94.9 Field proctor #6 98.0 17.2 96.8 95 D6938 Pass
Location : Building Lot #41, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
02/23/2026 4 14.7 94.7 Field proctor #6 98.0 17.2 96.6 95 D6938 Pass
Location : Building Lot #41, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 23, 2026
Reviewer Name / DateKenneth Mosman, February 26, 2026