Skip to content

Density Test Report

Date :02/24/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :02/24/2026 12:00
Onsite Hours :02:30
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :02/24/2026 14:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/24/2026 1 12.6 115.3 2025-033 SP 104.0 16.2 98.5 98 D6938 Pass
Location : Roadway left side at STA 0+85, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :91643
02/24/2026 2 14.2 101.9 2025-033 SP 104.0 16.2 98.0 98 D6938 Fail
Location : Roadway at STA 1+50, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :91643
02/24/2026 3 14.0 102.0 2025-033 SP 104.0 16.2 98.1 98 D6938 Pass
Location : Roadway at STA 2+20, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, February 24, 2026
Reviewer Name / DateKenneth Mosman, February 26, 2026