Skip to content

Density Test Report

Date :02/23/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :02/23/2026 15:00
Onsite Hours :01:15
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :Sunny
Departure Time :02/23/2026 16:15
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/23/2026 1 34.4 82.9 2025-057 92.1 25.7 90.0 95 D6938 Fail
Location : Pipeline V, Elv/Depth :3 feet below finished grade
Comment : In-situ moisture contents well above optimum. Recommend scarify, aerate and recompact. Injection of drier than optimum soils may help too. Gauge Serial No. :77-19952
02/23/2026 2 35.0 83.3 2025-057 92.1 25.7 90.4 95 D6938 Fail
Location : Pipeline V, Elv/Depth :3 feet below finished grade
Comment : In-situ moisture contents well above optimum. Recommend scarify, aerate and recompact. Injection of drier than optimum soils may help too. Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, February 23, 2026
Reviewer Name / DateKenneth Mosman, March 04, 2026