Density Test Report
Date :02/26/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :02/26/2026 08:00
Onsite Hours :05:30
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :rainey
Departure Time :02/26/2026 13:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 02/26/2026 | 1 | 15.3 | 95.6 | Field proctor #6 | 98.0 | 17.2 | 97.6 | 95 | D6938 | Pass |
| Location : | 30" CMP storm backfill between B2 and B3, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/26/2026 | 2 | 15.9 | 96.6 | Field proctor #6 | 98.0 | 17.2 | 98.6 | 95 | D6938 | Pass |
| Location : | Backfill at 30" CMP storm between B3 and B2, Elv/Depth :2 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/26/2026 | 3 | 14.3 | 102.2 | 2025-033 SP | 104.0 | 16.2 | 98.3 | 95 | D6938 | Pass |
| Location : | Backfill at 30" CMP storm between B3 and B4, Elv/Depth :8.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 02/26/2026 | 4 | 14.0 | 101.7 | 2025-033 SP | 104.0 | 16.2 | 97.8 | 95 | D6938 | Pass |
| Location : | Backfill at 30" CMP storm between B3 and B4, Elv/Depth :6.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, February 26, 2026
Reviewer Name / DateKenneth Mosman, March 03, 2026