Skip to content

Density Test Report

Date :02/23/2026
Project No :2025C281
Client Company :SR Homes
Arrival Time :02/23/2026 8:00
Onsite Hours :10:00
Name of the Project :Owen Mills - Owens Store Rd
Project Location :Canton
Weather :cold
Departure Time :02/23/2026 18:
ASEC Technician Name :

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/23/2026 11 18.6 94.7 2026-001 (on site cut) 99.1 20.1 95.6 95 D6938 Pass
Location : Lot #28, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
02/23/2026 12 14.9 102.6 2025-052 (off-site stockpile) 101.1 22.6 101.5 95 D6938 Pass
Location : Lot #28, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
02/23/2026 13 20.8 101.2 2025-052 (off-site stockpile) 101.1 22.6 100.1 95 D6938 Pass
Location : Lot #28, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
02/23/2026 14 17.5 102.0 2026-001 (on site cut) 99.1 20.1 102.9 98 D6938 Pass
Location : Lot #28, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateMahendra Mylabathula, February 23, 2026
Reviewer Name / DateKenneth Mosman, March 04, 2026