Skip to content

Density Test Report

Date :03/02/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :03/02/2026 08:00
Onsite Hours :08:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :cloudy
Departure Time :03/02/2026 16:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/02/2026 1 14.7 101.8 2025-033 SP 104.0 16.2 97.9 95 D6938 Pass
Location : Backfill of 8" ductile iron SS line between #4 and 2, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
03/02/2026 2 15.5 102.9 2025-035 SP 107.8 13.0 95.5 95 D6938 Pass
Location : Backfill of 8" ductile iron SS line between #4 and 2, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
03/02/2026 3 12.8 119.2 2025-035 SP 107.8 13.0 98.1 98 D6938 Pass
Location : Backfill of 8" ductile iron SS line between #4 and 2, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
03/02/2026 4 13.0 105.7 2025-035 SP 107.8 13.0 98.1 98 D6938 Pass
Location : Backfill of 8" ductile iron SS line between #4 and 2, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, March 2, 2026
Reviewer Name / DateKenneth Mosman, March 11, 2026