Density Test Report

Date :03/04/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :03/04/2026 08:00
Onsite Hours :9:30
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :03/04/2026 17:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/04/2026 1 23.6 121.9 2025-023 SP 103.5 18.9 95.3 95 D6938 Pass
Location : Lot #52, Elv/Depth :1043.7
Comment : Gauge Serial No. :91487
03/04/2026 2 23.7 98.7 2025-023 SP 103.5 18.9 95.4 95 D6938 Pass
Location : Lot #52, Elv/Depth :1045
Comment : Gauge Serial No. :91487
03/04/2026 3 24.1 123.1 2025-023 SP 103.5 18.9 95.8 95 D6938 Pass
Location : Lot #51, Elv/Depth :1043.1
Comment : Gauge Serial No. :91487
03/04/2026 4 26.7 98.5 2025-023 SP 103.5 18.9 95.2 95 D6938 Pass
Location : Lot #51, Elv/Depth :1042.2
Comment : Gauge Serial No. :91487
03/04/2026 5 23.6 98.5 2025-023 SP 103.5 18.9 95.2 95 D6938 Pass
Location : Lot #50, Elv/Depth :1042
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 4, 2026
Reviewer Name / DateKenneth Mosman, March 12, 2026