Density Test Report

Date :03/06/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :03/06/2026 08:00
Onsite Hours :08:30
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :03/06/2026 16:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/06/2026 1 16.5 102.4 2025-022 SP 103.7 16.1 98.7 95 D6938 Pass
Location : Lot #50, Elv/Depth :1043
Comment : Gauge Serial No. :91487
03/06/2026 2 17.1 103.9 2025-022 SP 103.7 16.1 100.2 95 D6938 Pass
Location : Lot #50, Elv/Depth :1044
Comment : Gauge Serial No. :91487
03/06/2026 3 18.7 104.7 2025-022 SP 103.7 16.1 101.0 95 D6938 Pass
Location : Lot #51, Elv/Depth :1045
Comment : Gauge Serial No. :91487
03/06/2026 4 21 98.4 2025-023 SP 103.5 18.9 95.1 95 D6938 Pass
Location : Lot #51, Elv/Depth :1045
Comment : Gauge Serial No. :91487
03/06/2026 5 19.9 99.2 2025-022 SP 103.7 16.1 95.7 95 D6938 Pass
Location : Lot #52, Elv/Depth :1047
Comment : Gauge Serial No. :91487
03/06/2026 6 18 103.5 2025-023 SP 103.5 18.9 100.0 95 D6938 Pass
Location : Lot #53, Elv/Depth :1050
Comment : Gauge Serial No. :91487
03/06/2026 7 19.3 106.8 2025-023 SP 103.5 18.9 103.2 95 D6938 Pass
Location : Lot #53, Elv/Depth :1050.5
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 6, 2026
Reviewer Name / DateKenneth Mosman, March 12, 2026