Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the
purpose of providing quality control inspection and testing services. Visual observation techniques were
employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.
Our ASEC representative was on site as requested by the contractor (Lewis Grading) for the
observation/testing of the placement of fill/backfill.
ASEC met with Nick (Lewis Grading) to discuss site conditions and requested testing locations. The contractor has been backfilling storm and sewer line around the site. It appears that the backfill was compacted with a vibrating sheep’s foot roller. Density testing was conducted and test results were provided to the contractor.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding