Density Test Report

Date :03/05/2026
Project No :2025C269
Client Company :Lewis Contracting
Arrival Time :03/05/2026 07:00
Onsite Hours :02:00
Name of the Project :Main St. & First Ave. - Mixed-use
Project Location :Lilburn
Weather :Sunny
Departure Time :03/05/2026 09:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/05/2026 1 24.6 124.5 2026-010 98.1 22.4 101.8 98 D6938 Pass
Location : Upflow to A-2, Elv/Depth :at finished grade
Comment : Gauge Serial No. :77-19952
03/05/2026 2 29.1 93.0 2026-010 98.1 22.4 94.8 98 D6938 Fail
Location : Upflow to A-2, Elv/Depth :at finished grade
Comment : notified contractor of high moisture content in this area Gauge Serial No. :77-19952
03/05/2026 3 22.4 122.1 2026-010 98.1 22.4 101.7 95 D6938 Pass
Location : S-1 to T-1, Elv/Depth :2 to 3 feet over pipe
Comment : Gauge Serial No. :77-19952
03/05/2026 4 21.8 122.4 2026-010 98.1 22.4 102.4 95 D6938 Pass
Location : S-1 to T-1, Elv/Depth :2 to 3 feet over pipe
Comment : Gauge Serial No. :77-19952
03/05/2026 5 24.4 124.6 2026-010 98.1 22.4 102.1 98 D6938 Pass
Location : S-3 to S-4, Elv/Depth :at finished grade
Comment : Gauge Serial No. :77-19952
03/05/2026 6 24.1 124.0 2026-010 98.1 22.4 101.8 98 D6938 Pass
Location : S-3 to S-4, Elv/Depth :at finished grade
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, March 5, 2026
Reviewer Name / DateKenneth Mosman, March 12, 2026