Density Test Report

Date :03/04/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :03/04/2026 07:30
Onsite Hours :10:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :03/04/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/04/2026 1 22.4 90.8 2025-032 SP 94.9 25.0 95.7 95 D6938 Pass
Location : Backfill of 8" SS line between B-3 and B-4, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
03/04/2026 2 24.0 90.8 2025-032 SP 94.9 25.0 95.7 95 D6938 Pass
Location : Backfill of 8" SS line between B-3 and B-4, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
03/04/2026 3 15.1 99.3 2025-033 SP 104.0 16.2 95.5 95 D6938 Pass
Location : Backfill of 8" SS line between B-3 and B-4, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, March 4, 2026
Reviewer Name / DateKenneth Mosman, March 11, 2026