- Home
- Density Test Report Report ID: 91255
- Edit Download Report
Density Test Report
Date :03/09/2026
Project No :2025C211
Client Company :Pulte
Arrival Time :03/09/2026 10:00
Onsite Hours :04:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :03/09/2026 14:00
ASEC Technician Name :Sean Willett
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 03/09/2026 | 1 | 14.5 | 110.3 | 2025-055 | 107.3 | 15.5 | 102.8 | 95 | D6938 | Pass |
| Location : | Lot #30, Elv/Depth :3 to 4 feet below finished grade | |||||||||
| Comment : | large amount of PWR present | Gauge Serial No. :77-19952 | ||||||||
| 03/09/2026 | 2 | 18.5 | 95.1 | FP 2 | 100.0 | 18.5 | 95.1 | 95 | D6938 | Pass |
| Location : | Lot #31, Elv/Depth :3 to 4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :77-19952 | |||||||||
| 03/09/2026 | 3 | 18.4 | 101.4 | FP 2 | 100.0 | 18.5 | 101.4 | 95 | D6938 | Pass |
| Location : | Lot #32, Elv/Depth :3 to 4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :77-19952 | |||||||||
| 03/09/2026 | 4 | 17.5 | 94.2 | FP 2 | 100.0 | 18.5 | 94.2 | 95 | D6938 | Fail |
| Location : | Lot #33, Elv/Depth :3 to 4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :77-19952 | |||||||||
| 03/09/2026 | 5 (retest) | 20.4 | 95.1 | FP 2 | 100.0 | 18.5 | 95.1 | 95 | D6938 | Pass |
| Location : | Lot #33, Elv/Depth :3 to 4 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :77-19952 | |||||||||
Technician Signature / DateSean Willett, March 9, 2026
Reviewer Name / DateKenneth Mosman, March 19, 2026
