Skip to content

Density Test Report

Date :03/19/2026
Project No :2026C103
Client Company :Artisan
Arrival Time :03/19/2026 08:00
Onsite Hours :06:00
Name of the Project :NW PH 2, UNIT 4
Project Location :Dallas
Weather :sunny
Departure Time :03/19/2026 14:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/19/2026 1 13.4 96.6 Field proctor #6 98.0 17.2 98.6 95 D6938 Pass
Location : Backfill around manhole #B5, Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :91643
03/19/2026 2 14.8 96.4 Field proctor #6 98.0 17.2 98.4 98 D6938 Pass
Location : Backfill around manhole # B5, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, March 19, 2026
Reviewer Name / DateKenneth Mosman, March 24, 2026