- Home
- Daily Field Report Report ID: 91432
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was on site to observe drying conditions of the in-place wet soils previously evaluated at Lots #41 and 42. The grading contractor had plowed in place wet soils to depths of one-to-two-and-a-half feet using a dozer attempting to dry wet soil materials. The contractor plans to continue plowing materials for aeration today and requested a re-evaluation on Monday, 3/23/26.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Observing in place plowed soils for drying at lots 41 and 42

