Skip to content

Density Test Report

Date :03/19/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :03/19/2026 06:00
Onsite Hours :12:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :03/19/2026 18:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/19/2026 1 14.7 103.5 2025-023 SP 103.5 18.9 100.0 95 D6938 Pass
Location : Lot #37, Elv/Depth :1035
Comment : Gauge Serial No. :91487
03/19/2026 2 16.2 102.5 2025-023 SP 103.5 18.9 99.0 95 D6938 Pass
Location : Lot #37, Elv/Depth :1035.6
Comment : Gauge Serial No. :91487
03/19/2026 3 18 98.5 2025-023 SP 103.5 18.9 95.2 95 D6938 Pass
Location : Lot #38, Elv/Depth :1033
Comment : Gauge Serial No. :91487
03/19/2026 4 16.4 114.5 2025-023 SP 103.5 18.9 95.1 95 D6938 Pass
Location : Lot #38, Elv/Depth :1032.8
Comment : Gauge Serial No. :91487
03/19/2026 5 16 103.2 2025-023 SP 103.5 18.9 99.7 95 D6938 Pass
Location : Lot #39, Elv/Depth :1031
Comment : Gauge Serial No. :91487
03/19/2026 6 20.3 118.6 2025-023 SP 103.5 18.9 95.3 95 D6938 Pass
Location : Lot #39, Elv/Depth :1030.6
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 19, 2026