Skip to content

Density Test Report

Date :03/27/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :03/27/2026 08:00
Onsite Hours :06:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :03/27/2026 14:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/27/2026 1 21.7 98.8 2025-023 SP 103.5 18.9 95.5 95 D6938 Pass
Location : Lot #6, Elv/Depth :1056
Comment : Gauge Serial No. :91487
03/27/2026 2 20.1 99.8 2025-023 SP 103.5 18.9 96.4 95 D6938 Pass
Location : Lot #6, Elv/Depth :1055.6
Comment : Gauge Serial No. :91487
03/27/2026 3 17.8 115.9 2025-023 SP 103.5 18.9 95.1 95 D6938 Pass
Location : Lot #48, Elv/Depth :1039
Comment : Gauge Serial No. :91487
03/27/2026 4 16.6 114.8 2025-023 SP 103.5 18.9 95.2 95 D6938 Pass
Location : Lot #48, Elv/Depth :1039
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 27, 2026
Reviewer Name / DateKenneth Mosman, April 02, 2026