Density Test Report

Date :03/27/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :03/27/2026 14:00
Onsite Hours :03:30
Name of the Project :Seven Hills PHASE 13, UNIT 4 Lots
Project Location :Dallas
Weather :sunny
Departure Time :03/27/2026 17:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/27/2026 1 24.4 86.1 2025-032 SP 94.9 25.0 90.7 95 D6938 Fail
Location : Lot #41, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91487
03/27/2026 2 23.9 104.5 2025-032 SP 94.9 25.0 88.8 95 D6938 Fail
Location : Lot #41, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91487
03/27/2026 3 27.9 83.1 2025-032 SP 94.9 25.0 87.6 95 D6938 Fail
Location : Lot #42, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91487
03/27/2026 4 22.7 87.5 2025-032 SP 94.9 25.0 92.2 95 D6938 Fail
Location : Lot #42, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, March 27, 2026
Reviewer Name / DateKenneth Mosman, April 02, 2026