Skip to content

Daily Field Report

Date :03/30/2026
Project No :2025C186
Client Company :CWM
Arrival Time :03/30/2026
Onsite Hours :
Name of the Project :Tom B. David Airport - Rehab Parallel Taxiway & Terminal Apron
Project Location :Calhoun
Weather :sunny
Departure Time :03/30/2026
ASEC Technician Name :Russell Hendrix

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day:

A proof-roll was performed using a loaded tandem dump truck in the presence of representatives from UES, Lead Edge, and CW Matthews along the A3 extension from Station 41+00 to Station 43+50 (see photos). The subgrade was deemed acceptable throughout the tested area, with the exception of a section near Station 43+00 measuring approximately 30 feet by 15 feet.

UES recommended undercutting this localized area to an additional depth of 1 foot and replacing the material with 12 inches of No. 4 stone. The use of fabric or geogrid was not recommended for this repair by UES.  Remediation was completed on this day by CW Matthews.

The remaining area proof-rolled had Graded Aggregate Base (GAB) placed, watered, and compacted (see photos) but was not completed.

No further observations were made.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

working on area

compacting

load ticket

watering GAB

remediation area completed

fine grading

smooth drum roller

Proof roll

Remediation area

full area

Depth

Technician Signature / DateRussell Hendrix, March 30, 2026
Reviewer Name / DateKenneth Mosman, April 08, 2026