Skip to content

Density Test Report

Date :04/02/2026
Project No :2025C186
Client Company :CWM
Arrival Time :04/02/2026
Onsite Hours :
Name of the Project :Tom B. David Airport - Rehab Parallel Taxiway & Terminal Apron
Project Location :Calhoun
Weather :overcast
Departure Time :04/02/2026
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/02/2026 1 3.8 147.6 2025-065 150.1 5.3 98.3 98 D6938 Pass
Location : A3 Taxiway Center, Elv/Depth :Top of subgrade
Comment : Gauge Serial No. :38069
04/02/2026 2 3.5 143.3 2025-065 150.1 5.3 95.5 98 D6938 Fail
Location : A# to A4 connector Center, Elv/Depth :Top of Subgrade
Comment : UES stated the test result was acceptable Gauge Serial No. :38069
04/02/2026 3 3.7 148.2 2025-065 150.1 5.3 98.7 98 D6938 Pass
Location : A4 Taxiway, Elv/Depth :Top of subgrade
Comment : Gauge Serial No. :38069
Technician Signature / DateRussell Hendrix, April 2, 2026
Reviewer Name / DateKenneth Mosman, April 08, 2026