Density Test Report

Date :04/01/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/01/2026 08:00
Onsite Hours :05:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :04/01/2026 13:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/01/2026 1 18.1 101.8 2025-023 SP 103.5 18.9 98.4 95 D6938 Pass
Location : Lot #20, Elv/Depth :1048
Comment : Gauge Serial No. :91487
04/01/2026 2 20.1 99.4 2025-023 SP 103.5 18.9 96.0 95 D6938 Pass
Location : Lot #20, Elv/Depth :1048.5
Comment : Gauge Serial No. :91487
04/01/2026 3 22.7 99.8 2025-023 SP 103.5 18.9 96.4 95 D6938 Pass
Location : Lot #21, Elv/Depth :1046
Comment : Gauge Serial No. :91487
04/01/2026 4 21.1 98.5 2025-023 SP 103.5 18.9 95.2 95 D6938 Pass
Location : Lot #21, Elv/Depth :1046
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, April 1, 2026
Reviewer Name / DateKenneth Mosman, April 13, 2026