Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Crew began work on Lots #20, 21, and 22 by placing fill material in lifts and compacting it using a Caterpillar 815 compactor. At Lot #22, the material was cut and reworked to achieve the required slope.
At the Neighborhood Buford area, the crew continued excavating the trench to the required length and depth using a hydraulic excavator equipped with a rock grinder.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.