Density Test Report

Date :04/06/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/06/2026 08:00
Onsite Hours :10:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :04/06/2026 18:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/06/2026 1 12.4 107.0 2025-023 SP 103.5 18.9 103.4 95 D6938 Pass
Location : Lot #46, Elv/Depth :1028
Comment : Gauge Serial No. :91487
04/06/2026 2 12.4 106.0 2025-023 SP 103.5 18.9 102.4 95 D6938 Pass
Location : Lot #46, Elv/Depth :1029
Comment : Gauge Serial No. :91487
04/06/2026 3 15.1 99.8 2025-023 SP 103.5 18.9 96.4 95 D6938 Pass
Location : Lot #46, Elv/Depth :1028.5
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, April 6, 2026
Reviewer Name / DateKenneth Mosman, April 13, 2026