- Home
- Daily Field Report Report ID: 93024
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was on site to observe the pipe contractor continue backfilling and completing OCS installation. The backfill observation over the 36″ RCP storm line was completed and appeared to be in compliance with site compaction requirements. The contractor continued installation of the OCS.
The pipe contractor performing the directional boring tap in for the water line encountered hard rock within the last fifteen feet today.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Rip Rap place at OCS headwall structure

Completed backfill at dam embankment


Pouring concrete base for trash rack