Density Test Report

Date :04/14/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/14/2026 08:00
Onsite Hours :10:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :04/14/2026 18:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/14/2026 1 10.9 102.7 2025-023 SP 103.5 18.9 99.2 98 D6938 Pass
Location : Roadway adjacent to Lot #63, Elv/Depth :1039
Comment : Gauge Serial No. :91487
04/14/2026 2 13.6 115.8 2025-023 SP 103.5 18.9 98.5 98 D6938 Pass
Location : Roadway adjacent to Lot #62, Elv/Depth :1040
Comment : Gauge Serial No. :91487
04/14/2026 3 20.1 99.3 2025-022 SP 103.7 16.1 95.8 95 D6938 Pass
Location : Lot #62, Elv/Depth :1037
Comment : Gauge Serial No. :91487
04/14/2026 4 17.9 100.4 2025-022 SP 103.7 16.1 96.8 95 D6938 Pass
Location : Lot #63, Elv/Depth :1037.5
Comment : Gauge Serial No. :91487
04/14/2026 5 19.1 100.3 2025-023 SP 103.5 18.9 96.9 95 D6938 Pass
Location : Lot #64, Elv/Depth :1037
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, April 14, 2026
Reviewer Name / DateKenneth Mosman, April 27, 2026