Skip to content

Density Test Report

Date :04/17/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :04/17/2026 08:00
Onsite Hours :10:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :04/17/2026 18:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/17/2026 1 21.4 119.7 2025-023 SP 103.5 18.9 95.3 95 D6938 Pass
Location : Lot #62, Elv/Depth :1042
Comment : Gauge Serial No. :91487
04/17/2026 2 20.5 99.8 2025-023 SP 103.5 18.9 96.4 95 D6938 Pass
Location : Lot #62, Elv/Depth :1042.5
Comment : Gauge Serial No. :91487
04/17/2026 3 19.2 98.7 2025-022 SP 103.7 16.1 95.2 95 D6938 Pass
Location : Lot #63, Elv/Depth :1041.5
Comment : Gauge Serial No. :91487
04/17/2026 4 20.1 99.7 2025-022 SP 103.7 16.1 96.1 95 D6938 Pass
Location : Lot #63, Elv/Depth :1042
Comment : Gauge Serial No. :91487
04/17/2026 5 19.4 118.1 2025-022 SP 103.7 16.1 95.4 95 D6938 Pass
Location : Lot #64, Elv/Depth :1040
Comment : Gauge Serial No. :91487
04/17/2026 6 18.4 117.3 2025-022 SP 103.7 16.1 95.6 95 D6938 Pass
Location : Lot #64, Elv/Depth :1040.5
Comment : Gauge Serial No. :91487
Technician Signature / DateSamara Simha Reddy Kandi, April 17, 2026
Reviewer Name / DateKenneth Mosman, April 27, 2026