Daily Field Report

Date :04/20/2026
Project No :2025C211
Client Company :Pulte
Arrival Time :04/20/2026 07:00
Onsite Hours :05:00
Name of the Project :Haley's Bluff - Philadelphia Rd.
Project Location :Jasper
Weather :Sunny
Departure Time :04/20/2026 12:00
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Our ASEC representative was on site to observe the contractor (NG Grading) and for the observation/testing of the placement of fill/backfill. The grading crew continued to fill on Lots #33 through #44 located above retaining wall 1. Fill was spread in 8-to-12-inch lifts and compacted using a sheep-foot roller. Density testing was performed and test results were provided to the contractor. The grading crew is starting to haul and place blasted rock into the deep fill areas along these lots. ASEC watched as loaded off road trucks rolled across the lifts to check for stability. There were no signs of severe pumping or deflection present.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

commercial lot

lots above wall 1

site picture

Technician Signature / DateSean Willett, April 20, 2026
Reviewer Name / DateKenneth Mosman, April 23, 2026