Density Test Report

Date :04/24/2026
Project No :2026C133
Client Company :Artisan
Arrival Time :04/24/2026 09:00
Onsite Hours :07:30
Name of the Project :Salacoa (AKA Boone Ford Rd) Robert's Dam
Project Location :Calhoun
Weather :Sunny
Departure Time :04/24/2026 16:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/24/2026 1 24.4 88.9 133-3 (field proctor) 91.8 22.5 96.8 95 D6938 Pass
Location : Fill placement at dam embankment toe of slope, Elv/Depth :697.70
Comment : Gauge Serial No. :91643
04/24/2026 2 25.2 89.8 133-3 (field proctor) 91.8 22.5 97.8 95 D6938 Pass
Location : fill placement at dam embankment toe of slope, Elv/Depth :693.86
Comment : Gauge Serial No. :91643
04/24/2026 3 23.3 89.9 133-3 (field proctor) 91.8 22.5 97.9 95 D6938 Pass
Location : Fill placement at dam embankment toe of slope, Elv/Depth :688.66
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, April 24, 2026
Reviewer Name / DateKenneth Mosman, April 27, 2026