Skip to content

Density Test Report

Date :04/30/2026
Project No :2025C260
Client Company :Artisan
Arrival Time :04/30/2026 08:00
Onsite Hours :07:00
Name of the Project :NW (PHASE 2) Parkway Extension
Project Location :Dallas
Weather :sunny
Departure Time :04/30/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/30/2026 1 14.3 121.2 2025-035 SP 107.8 13.0 98.3 98 D6938 Pass
Location : Between Manhole B7 and B9, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
04/30/2026 2 15.7 122.8 2025-035 SP 107.8 13.0 98.4 98 D6938 Pass
Location : Between Manhole B7 and B9, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, April 30, 2026
Reviewer Name / DateKenneth Mosman, May 11, 2026