- Home
- Density Test Report Report ID: 94236
- Edit Download Report
Density Test Report
Date :04/23/2026
Project No :2023C159
Client Company :CW Matthews
Arrival Time :04/23/2026
Onsite Hours :
Name of the Project :Airfield Repairs 2021-23
Project Location :HJAIA, Atlanta, GA
Weather :overcast
Departure Time :04/23/2026
ASEC Technician Name :Russell Hendrix
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 04/23/2026 | 1 | 8.3 | 108.8 | 2026-111 | 119.3 | 10.6 | 91.2 | 90 | D6938 | Pass |
| Location : | Area 2, Elv/Depth :subgrade top lift | |||||||||
| Comment : | Pass / QA in agreement | Gauge Serial No. :38069 | ||||||||
| 04/23/2026 | 2 | 7.6 | 117.9 | 2026-111 | 119.3 | 10.6 | 98.8 | 90 | D6938 | Pass |
| Location : | area 2, Elv/Depth :subgrade top lift (before topsoil) | |||||||||
| Comment : | Pass / QA in agreement. | Gauge Serial No. :38069 | ||||||||
Technician Signature / DateRussell Hendrix, April 23, 2026
