Daily Field Report

Date :05/13/2026
Project No :2025C260
Client Company :Artisan
Arrival Time :05/13/2026 8
Onsite Hours :NaN:00
Name of the Project :NW (PHASE 2) Parkway Extension
Project Location :Dallas
Weather :clear and sunny
Departure Time :05/13/2026 3
ASEC Technician Name :Narayana Ganesh Undavalli

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

The contractor continued working on Lots #A12, B8, B9 and the adjacent roadway area. Fill material was placed in lifts, spread using a crawler bulldozer, and compacted using both a sheep-foot roller and a Caterpillar 815. Density tests were performed, and the results met the required project compaction specifications.

Contractor continued working on the Naturewalk Parkway roadside slope. Fill material was placed in lifts, spread using a crawler bulldozer and compacted using a caterpillar 815. Density tests were performed and the results met the required project compaction specifications.

At the Naturewalk neighborhood site, the crew continued trench excavation using a hydraulic excavator equipped with a rock grinder to achieve the required depth and width.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateNarayana Ganesh Undavalli, May 13, 2026
Reviewer Name / DateKenneth Mosman, June 03, 2026