Skip to content

Density Test Report

Date :05/19/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :05/19/2026 07:30
Onsite Hours :9:30
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :Sunny
Departure Time :05/19/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/19/2026 1 19.3 104.1 North Bridge mixture 106.8 17.5 97.5 95 D6938 Pass
Location : Backfill at north side bridge abutment, Elv/Depth :776
Comment : Gauge Serial No. :91643
05/19/2026 2 20.2 104.4 North Bridge mixture 106.8 17.5 97.8 95 D6938 Pass
Location : , Elv/Depth :776
Comment : Gauge Serial No. :91643
05/19/2026 3 22.6 92.0 2025-032 SP 94.9 25.0 96.9 95 D6938 Pass
Location : , Elv/Depth :776
Comment : Gauge Serial No. :91643
05/19/2026 4 21.3 93.7 2025-032 SP 94.9 25.0 98.7 95 D6938 Pass
Location : , Elv/Depth :778
Comment : Gauge Serial No. :91643
05/19/2026 5 23.3 92.9 2025-032 SP 94.9 25.0 97.9 95 D6938 Pass
Location : , Elv/Depth :778
Comment : Gauge Serial No. :91643
05/19/2026 6 20.7 104.6 North Bridge mixture 106.8 17.5 97.9 95 D6938 Pass
Location : , Elv/Depth :779
Comment : Gauge Serial No. :91643
05/19/2026 779 19.4 104.6 North Bridge mixture 106.8 17.5 97.9 95 D6938 Pass
Location : , Elv/Depth :779
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, May 19, 2026