Skip to content

Density Test Report

Date :05/20/2026
Project No :2026C142
Client Company :KFE
Arrival Time :05/20/2026
Onsite Hours :
Name of the Project :Bailey Station Way
Project Location :Sharpsburg
Weather :overcast
Departure Time :05/20/2026
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/20/2026 1 22.3 94.5 2026-155 103.1 19.1 91.7 90 D6938 Pass
Location : North - Center of site, Elv/Depth :2 to 3 feet above original grade
Comment : proctor unknown Gauge Serial No. :38069
05/20/2026 2 25 79.8 2026-159 94.5 25.2 84.4 90 D6938 Fail
Location : South center of site, Elv/Depth :2 to 3 feet above original grade
Comment : Recompaction is required. Gauge Serial No. :38069
Technician Signature / DateRussell Hendrix, May 20, 2026
Reviewer Name / DateKenneth Mosman, June 03, 2026