Density Test Report
Date :05/21/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :05/14/2026 07:30
Onsite Hours :9:30
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :cloudy
Departure Time :05/14/2026 17:00
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 05/21/2026 | 1 | 22.3 | 114.1 | 2025-032 SP | 94.9 | 25.0 | 98.3 | 98 | D6938 | Pass |
| Location : | Backfill at wall bridge abutment, Elv/Depth :1.5 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 05/21/2026 | 2 | 23.4 | 94.2 | 2025-032 SP | 94.9 | 25.0 | 99.3 | 98 | D6938 | Pass |
| Location : | backfill at wall bridge abutment, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 05/21/2026 | 3 | 22.7 | 93.6 | 2025-032 SP | 94.9 | 25.0 | 98.6 | 98 | D6938 | Pass |
| Location : | backfill at wall bridge abutment, Elv/Depth :1 foot below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, May 21, 2026
Reviewer Name / DateKenneth Mosman, May 28, 2026