Density Test Report

Date :05/22/2026
Project No :2026C142
Client Company :KFE
Arrival Time :05/22/2026 08:30
Onsite Hours :02:00
Name of the Project :Bailey Station Way
Project Location :Sharpsburg
Weather :sunny
Departure Time :05/22/2026 10:30
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
05/22/2026 1 23.7 89.9 2026-159 94.5 25.2 95.1 95 D6938 Pass
Location : Suite 1, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
05/22/2026 2 24.7 93.3 2026-159 94.5 25.2 98.7 95 D6938 Pass
Location : suite 1, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, May 22, 2026
Reviewer Name / DateKenneth Mosman, June 03, 2026