- Home
- Density Test Report Report ID: 94976
- Edit Download Report
Density Test Report
Date :06/01/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :06/01/2026 08:00
Onsite Hours :08:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :06/01/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 06/01/2026 | 1 | 19.1 | 101.7 | 2025-023 SP | 103.5 | 18.9 | 98.3 | 95 | D6938 | Pass |
| Location : | CO at R/W next to Lot #34, Elv/Depth :1014 | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 06/01/2026 | 2 | 17.7 | 101.8 | 2025-022 SP | 103.7 | 16.1 | 98.2 | 95 | D6938 | Pass |
| Location : | CO at R/W next to Lot #34, Elv/Depth :1014.5 | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 06/01/2026 | 3 | 15.5 | 102.6 | 2025-022 SP | 103.7 | 16.1 | 98.9 | 95 | D6938 | Pass |
| Location : | CO at R/W next to Lot #35, Elv/Depth :1015 | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 06/01/2026 | 4 | 20.2 | 100.8 | 2025-023 SP | 103.5 | 18.9 | 97.4 | 95 | D6938 | Pass |
| Location : | CO at R/W next to Lot #35, Elv/Depth :1015.5 | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 06/01/2026 | 5 | 18.7 | 103.3 | 2025-023 SP | 103.5 | 18.9 | 99.8 | 95 | D6938 | Pass |
| Location : | Lot #34, Elv/Depth :1011 | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 06/01/2026 | 6 | 16.8 | 98.6 | 2025-022 SP | 103.7 | 16.1 | 95.1 | 95 | D6938 | Pass |
| Location : | Lot #35, Elv/Depth :1014 | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
Technician Signature / DateSamara Simha Reddy Kandi, June 1, 2026
Reviewer Name / DateKenneth Mosman, June 15, 2026
