Skip to content

Density Test Report

Date :06/01/2026
Project No :2025C149
Client Company :Davidson Homes
Arrival Time :06/01/2026 08:00
Onsite Hours :08:00
Name of the Project :Grove at E. Thompson Mill Rd
Project Location :Buford
Weather :sunny
Departure Time :06/01/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/01/2026 1 19.1 101.7 2025-023 SP 103.5 18.9 98.3 95 D6938 Pass
Location : CO at R/W next to Lot #34, Elv/Depth :1014
Comment : Gauge Serial No. :38069
06/01/2026 2 17.7 101.8 2025-022 SP 103.7 16.1 98.2 95 D6938 Pass
Location : CO at R/W next to Lot #34, Elv/Depth :1014.5
Comment : Gauge Serial No. :38069
06/01/2026 3 15.5 102.6 2025-022 SP 103.7 16.1 98.9 95 D6938 Pass
Location : CO at R/W next to Lot #35, Elv/Depth :1015
Comment : Gauge Serial No. :38069
06/01/2026 4 20.2 100.8 2025-023 SP 103.5 18.9 97.4 95 D6938 Pass
Location : CO at R/W next to Lot #35, Elv/Depth :1015.5
Comment : Gauge Serial No. :38069
06/01/2026 5 18.7 103.3 2025-023 SP 103.5 18.9 99.8 95 D6938 Pass
Location : Lot #34, Elv/Depth :1011
Comment : Gauge Serial No. :38069
06/01/2026 6 16.8 98.6 2025-022 SP 103.7 16.1 95.1 95 D6938 Pass
Location : Lot #35, Elv/Depth :1014
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, June 1, 2026
Reviewer Name / DateKenneth Mosman, June 15, 2026