Skip to content

Daily Field Report

Date :06/03/2026
Project No :2026C133
Client Company :Artisan
Arrival Time :06/03/2026 13:00
Onsite Hours :04:00
Name of the Project :Salacoa (AKA Boone Ford Rd) Robert's Dam
Project Location :Calhoun
Weather :sunny
Departure Time :06/03/2026 17:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

At the proposed pond dam concrete spillway, the subgrade soil conditions were visually inspected prior to the start of concrete spillway construction. The front slope of the pond dam, top of dam and back slope were visually inspected and found to be of suitable material and bearing capable of supporting the proposed spillway. These areas appeared stable and ready for the next phase of work.

The survey crew established and verified the layout stakes for the spillway centerline, spillway limits, and adjacent dam slopes in accordance with the construction plans. The staking provided reference points for spillway alignment, toe locations, and grading limits associated with the pond dam improvements.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateSamara Simha Reddy Kandi, June 3, 2026
Reviewer Name / DateKenneth Mosman, June 17, 2026