Skip to content

Density Test Report

Date :06/12/2026
Project No :2026C142
Client Company :KFE
Arrival Time :06/12/2026 14:00
Onsite Hours :02:00
Name of the Project :Bailey Station Way
Project Location :Sharpsburg
Weather :sunny
Departure Time :06/12/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/12/2026 1 29.6 92.1 2026-159 94.5 25.2 97.5 95 D6938 Pass
Location : Next to Suite 4, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :38069
06/12/2026 2 30.3 91.1 2026-159 94.5 25.2 96.4 95 D6938 Pass
Location : Next to Suite 4, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, June 12, 2026
Reviewer Name / DateKenneth Mosman, July 06, 2026