Concrete Test Report

Date :06/17/2026
Project No :2026C125
Client Company :Lewis Contracting
Arrival Time :06/17/2026 09:00
Onsite Hours :02:00
Name of the Project :Pittman Park - Garibaldi St. Stormwater
Project Location :Atlanta
Weather :sunny
Departure Time :06/17/2026 11:00
ASEC Technician Name :Samara Simha Reddy Kandi

Concrete Placement Information

Location(S): N/A
Testing: 2 Set of concrete specimens (2 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
2 Sets of concrete specimens/ 2 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks:

Field Test Data

Specimen Type Selection : Cylinder

Set Number :A
Date Sampled :06/09/2026
Sampled By :N/A
Contractor :Lewis Contracting
Truck Number :62382957
Time Batched :12:40
Location of Placement :Wall footings
Number of samples cast :2
Ambient Temperature (°f) :N/A
Slump (in.) :N/A
Water added (gal.) :N/A
Laboratory Number :2026C211-A
Time Sampled :N/A
Weather Condition :sunny
Concrete Supplier :Quickrete
Mix ID :45CNC595
Quantity of Load (cu. yd.) :9
Sample Cast :2
Specified Strength :4500
Concrete Temperature(°f) :N/A
Air Content (%) :N/A
Unit Weight (pcf) :N/A

Strength Test Results

Specimen Number Scheduled Test Date Date Tested Age (days) Dia(in.) Area (sq in.) Maximum Loads (lbf) Strength (lbs) % Design Strength Type of Fracture
1 07/07/2026 0
2 07/07/2026 N/A

UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.

(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed

Field Test Data

Specimen Type Selection : Cylinder

Set Number :B
Date Sampled :06/09/2026
Sampled By :N/A
Contractor :Lewis Contracting
Truck Number :62382956
Time Batched :13:03
Location of Placement :Wall footings
Number of samples cast :2
Ambient Temperature (°f) :N/A
Slump (in.) :N/A
Water added (gal.) :N/A
Laboratory Number :2026C211-B
Time Sampled :N/A
Weather Condition :sunny
Concrete Supplier :Quikrete
Mix ID :45CNC595
Quantity of Load (cu. yd.) :7
Sample Cast :2
Specified Strength :4500
Concrete Temperature(°f) :N/A
Air Content (%) :N/A
Unit Weight (pcf) :N/A

Strength Test Results

Specimen Number Scheduled Test Date Date Tested Age (days) Dia(in.) Area (sq in.) Maximum Loads (lbf) Strength (lbs) % Design Strength Type of Fracture
1 07/07/2026 N/A
2 07/07/2026 N/A

UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.

(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed

Technician Signature / DateSamara Simha Reddy Kandi, June 17, 2026
Reviewer Name / DateKenneth Mosman, June 26, 2026