Skip to content

Density Test Report

Date :06/16/2026
Project No :2025C216
Client Company :Artisan
Arrival Time :06/16/2026 08:00
Onsite Hours :07:00
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :Overcast
Departure Time :06/16/2026 15:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/16/2026 1 29.3 83.8 2025-032 SP 94.9 25.0 88.3 95 D6938 Fail
Location : 4900-5000 roadway, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :77-19952
06/16/2026 2 28.0 88.1 2025-032 SP 94.9 25.0 92.8 95 D6938 Fail
Location : 4900-5000 roadway, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :77-19952
06/16/2026 3 27.2 87.6 2025-032 SP 94.9 25.0 92.3 95 D6938 Fail
Location : 4900-5000 roadway, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :77-19952
06/16/2026 4 retest 22.9 96.6 2025-032 SP 94.9 25.0 101.8 95 D6938 Pass
Location : 4900-5000 roadway, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :77-19952
06/16/2026 5 retest 24.5 91.6 2025-032 SP 94.9 25.0 96.5 95 D6938 Pass
Location : 4900-5000 roadway, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :77-19952
06/16/2026 6 retest 26.7 83.9 2025-032 SP 94.9 25.0 88.4 95 D6938 Fail
Location : 4900-5000 roadway, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, June 16, 2026
Reviewer Name / DateKenneth Mosman, July 07, 2026